MSME Legal FAQs by City, Law and Service

600 detailed answers from Advocate BK Singh and the Legals365 team on delayed payments, MSEFC claims, Udyam, notices, arbitration and recovery across Delhi NCR. Pick a city, a law or a service to read its questions.

By City

MSME Lawyer FAQs: Faridabad

30 questions answered

1My forging unit in Faridabad supplies an auto company in Pune. Do I file against it before the Haryana council or before the council in Maharashtra?

You file before the Haryana council. Section 18(4) of the MSMED Act gives jurisdiction to the Facilitation Council of the area where the supplier is located, so a Faridabad unit with a valid Udyam registration can bring a Pune buyer to Haryana.

This surprises many buyers. Their purchase orders often say that disputes will be decided only at their head office city, and their legal teams write back citing that clause. The statute overrides such a clause, because Section 24 gives the delayed-payment chapter effect over anything inconsistent in any other law or agreement. The council will issue notice to the Pune buyer, and the buyer must either appear or risk the conciliation failing and the matter moving to arbitration without its side being heard properly. In practice, most out-of-state buyers do appear once the first notice arrives, if only to argue about the amount.

Two points decide whether your reference sails through. First, the location that counts is the place of your registered unit as shown on the Udyam certificate, so if your forging shop is in Faridabad but the certificate shows an old address elsewhere, correct the record before filing. Second, your invoices should be raised from the Faridabad unit and carry its GSTIN, so that the supply is clearly linked to the registered enterprise. Advocate BK Singh usually checks these two documents side by side at the first meeting, because a buyer looking for a technical objection will start there.

2How much interest can a Faridabad casting unit claim on an ?18 lakh invoice that has been unpaid for ten months?

On the current Bank Rate of 5.75%, the statutory rate is 17.25% a year, compounded monthly at 1.4375%, which gives roughly ?2,76,146 of interest on ?18 lakh over ten months of default.

The Bank Rate also changes from time to time. The 5.75% figure has applied from 7 October 2026, and earlier months may have carried a different rate, so a careful claim works month by month using the rate in force for each period. Check the current rate before you file.

One judgement call is worth making early. If the buyer has made part payments, apply them first against interest and then against principal, in the manner the statement of account supports, and show the working in a schedule the council can follow line by line. A clear schedule settles more disputes than a long legal argument.

3I run a machining job-work unit in Faridabad and the buyer supplies the raw material. Am I still a supplier under the MSMED Act?

A job-work unit can be a supplier under Section 2(n) if it holds a Udyam registration as a micro or small enterprise, because the Act covers the rendering of services as well as the supply of goods.

Where job-work units run into trouble is classification. Some register under a trading or general services code, or show the activity in a way that does not match what happens on the shop floor. A buyer facing a large claim will look at the Udyam certificate and argue that your enterprise is not what it says it is. The fix is to make sure the NIC code and the description on the certificate reflect machining or the relevant processing activity before you file a reference.

One honest limit applies. If your agreement makes you responsible for scrap or material loss and the buyer has deducted those amounts, the council will need to decide that dispute too, so prepare your scrap reconciliation before the hearing rather than after the buyer raises it.

4A buyer rejected sheet metal parts from my Faridabad unit two months after delivery. Can it still refuse to pay on that ground?

Usually not, because the explanation to Section 2(b) of the MSMED Act treats goods as accepted if the buyer raises no written objection within fifteen days of delivery.

The rule is called deemed acceptance. If a buyer receives your pressed brackets or enclosures, records them on a goods receipt note and stays silent for more than fifteen days, the law treats the goods as accepted on the day of delivery. Payment then falls due on the agreed date, capped at 45 days. A rejection letter sent sixty days later does not reopen acceptance. The buyer may still claim damages for genuinely defective goods, but that is a separate claim it must prove, not a reason to hold back the whole invoice.

5My Faridabad buyer keeps issuing debit notes for rejections and short supply. Can the Haryana council set aside these deductions?

The council can examine the debit notes as part of deciding the amount due under Section 17, and deductions the buyer cannot justify will not reduce your claim.

Start by sorting the debit notes into three groups. The first is genuine: rejected parts you took back, or quantity you did not supply. Accept those and remove them from the claim, because pressing a weak item spoils your credibility on the strong ones. The second is disputed but documented, such as a rejection where the buyer has an inspection report and you have a counter report. The third is unexplained, often round-figure deductions with no supporting paper. Those are the ones the council is most likely to disallow.

Your response trail helps. If you wrote back disputing each debit note when it was raised, that letter is valuable. If you accepted the debit notes silently in your own books, or signed a ledger confirmation reflecting them, the buyer will argue you agreed. That is not fatal, but it makes the argument harder.

One point often missed is GST. Where the buyer has issued a GST credit note mechanism or asked you to issue credit notes, look at whether you actually reversed output tax. If you did, you have probably accepted the deduction for tax purposes, and the claim should reflect that honestly.

6Which court in Faridabad hears a ?40 lakh commercial recovery suit, and must I try mediation before filing?

A ?40 lakh recovery claim arising from a supply contract is a commercial dispute and goes to the Commercial Court, Faridabad, and pre-institution mediation under Section 12A of the Commercial Courts Act must normally be attempted first.

Section 12A applies to commercial suits of ?3 lakh and above that do not seek urgent interim relief. In Patil Automation v Rakheja Engineers (2022), the Supreme Court held this requirement mandatory, so a suit filed without attempting mediation can be rejected. The application goes to the authority designated for pre-institution mediation under the Act, the buyer is called, and if it does not turn up or the talks fail, a non-starter or failure report is issued. Only then does the suit get filed.

The suit route is usually the better choice in particular situations, not as a general rule. A Faridabad supplier would typically sue in court when the council is not available: the supplies were made before Udyam registration, the unit is a medium enterprise, the goods were traded rather than manufactured, or the claim includes items outside the supply contract. Where the council is available, its interest provisions and pre-deposit protection make it more attractive for most micro and small units.

If you do sue, think about Order XXXVII of the Code of Civil Procedure. A summary suit on invoices, a written contract or an acknowledgment of debt makes the buyer seek leave to defend, and leave can be refused or made conditional if the defence looks sham. For a buyer who has signed ledger confirmations and never disputed quality, that is a strong lever.

The practical sequence is to send a demand notice, file the mediation application, use the mediation sitting to test whether the buyer has any real defence, and then file a summary suit with the failure report attached. Keep certified copies of GST returns ready, because the court will want proof of the supplies.

7My Faridabad fabrication unit got its Udyam registration in March but has been supplying the buyer since last year. Can I claim for the older invoices?

No, the delayed-payment chapter of the MSMED Act does not cover supplies made before your Udyam registration, so invoices raised before March fall outside the council route.

The Supreme Court in Silpi Industries (2021) confirmed that a supplier must be registered on the date of the supply to claim the benefit of the Act for that supply. Registration later does not reach back. So if you have twelve unpaid invoices and five were raised after the registration date, only those five can go to the Haryana council with statutory interest. The remaining seven need another route.

That route is usually a civil recovery. For a combined pre-registration balance of ?3 lakh or more, a commercial suit in Faridabad, preceded by Section 12A mediation, is the normal course. Interest on those older invoices will be whatever the contract provides, or what the court considers reasonable, not the 17.25% compounded figure. If the buyer issued a cheque that bounced against the older dues, a Section 138 complaint is also available.

The awkward question is whether to split the claim. Running a council reference for the newer invoices and a suit for the older ones doubles the paperwork and lets the buyer argue the same quality defence twice. Advocate BK Singh often recommends filing the council reference first, because the statutory interest and the pre-deposit rule put pressure on the buyer, and then using the conciliation sitting to negotiate a global settlement covering the older invoices too.

Check one thing carefully before deciding. Many units held an earlier Udyam Memorandum or an EM Part II before moving to Udyam. If your enterprise was registered under the earlier system and migrated, the date of first registration may help. Look at the old certificate and the migration record before writing off the older invoices as outside the Act.

8The purchase order from my Faridabad buyer says disputes go to a private arbitrator in Delhi. Can I still file before the Haryana council?

Yes, you can still file before the Haryana council, because the Supreme Court held in Gujarat State Civil Supplies v Mahakali Foods (2022) that the MSMED Act prevails over a private arbitration clause.

Buyers still try. Expect a letter saying the reference is not maintainable and threatening to invoke the private clause under Section 11 of the Arbitration Act. Expect, too, that the buyer may raise the objection again at the council. Neither objection usually goes far once Mahakali Foods is placed on record, but you should answer it in writing rather than ignore it, so the council has your response on file.

There is a timing point. If the buyer has already started a private arbitration and appointed an arbitrator before you approached the council, you have a choice to make quickly. Participating in the private proceedings without objection can create complications. Raising the MSMED Act objection at the very first opportunity, and filing your council reference without delay, protects your position.

The clause is not useless to you either. If your claim includes items outside the delayed-payment chapter, such as tooling charges under a separate contract or supplies made before registration, the private clause may be the proper forum for those. Read the purchase order as a whole and identify which parts of your claim are statutory dues and which are ordinary contract claims, before you choose where each one goes.

9A buyer lost a council award to my Faridabad unit and has filed a challenge. Does it have to deposit any money first?

It does. Section 19 of the MSMED Act requires a buyer challenging a council award to deposit 75% of the awarded amount with the court before the challenge can be entertained.

The Supreme Court in Goodyear India v Norton Intech (2012) held this requirement mandatory. The court hearing the challenge has no power to waive it. It may allow the deposit in instalments in a suitable case, but the buyer cannot proceed with a Section 34 application without depositing. Many buyers file the challenge and then ask for time, hoping to delay. If the deposit is not made, the challenge is liable to be dismissed.

The 75% is calculated on the full amount awarded, including interest up to the date of the award, not just the principal. If the award was for ?22 lakh principal and ?6 lakh interest, the buyer must deposit 75% of ?28 lakh, which is ?21 lakh. While the challenge is pending, the court may also permit the supplier to withdraw part of the deposited money on suitable conditions, often against security or an undertaking to refund if the award is set aside.

Your role as the award holder is to watch the file closely. Ask for a copy of the challenge petition as soon as it is filed, check whether the deposit has been made, and if not, press for dismissal on that ground at the earliest hearing. Do not stay silent and let months pass. Separately, keep your execution papers ready, because if the challenge fails or is dismissed for non-deposit, you will want to move immediately.

Remember that the grounds for setting aside a council award under Section 34 are narrow. A buyer generally cannot reargue the quality of the goods or the arithmetic of interest. Challenges based on procedural grounds or public policy rarely succeed where the council followed the Act and gave the buyer a fair hearing.

10

If you presented the cheque through your bank account maintained at a branch in Faridabad, Section 142(2) of the Negotiable Instruments Act gives the Faridabad courts jurisdiction over the complaint.

The timelines are strict. You must send a written demand within 30 days of receiving the return memo from your bank. The buyer then has 15 days from receiving the notice to pay. If it does not, the complaint must be filed within one month after those 15 days expire. Missing any of these windows can sink the case. Where the buyer is a company, Section 141 allows its directors and officers in charge of the business to be arraigned, provided the complaint describes their role properly.

The cheque case and an MSMED Act claim can run side by side. The criminal complaint deals with the dishonoured cheque, while the council deals with the full amount due, including invoices not covered by the cheque and statutory interest. Advocate BK Singh often uses both together, because the cheque case brings the directors personally into the picture and tends to concentrate minds at conciliation.

Two provisions add pressure. Under Section 143A, the trial court may order interim compensation of up to 20% of the cheque amount, and under Section 148 an appellate court can require a convicted drawer to deposit at least 20% of the fine or compensation. Keep the original cheque, the return memo and proof of delivery of your notice safe, because these papers form the backbone of the complaint.

Have a question that is not answered here? Share your invoices and correspondence with Advocate BK Singh for an initial review.

11A buyer owes my Faridabad engineering unit ?65 lakh. Can I file an insolvency petition against it?

Not under the current threshold, because Section 9 of the Insolvency and Bankruptcy Code requires a default of at least ?1 crore before an operational creditor can file, and ?65 lakh falls short.

The threshold is assessed on the amount in default, and some suppliers try to reach it by adding interest. Whether contractual or statutory interest counts towards the threshold depends on the facts and the documents, so do not plan a petition on the assumption that it will. If the buyer owes you ?65 lakh principal and a council award later quantifies interest, the position may change, but treat the IBC as a later option rather than the first move.

Even where the threshold is met, the IBC is not a recovery tool in the ordinary sense. A petition for a Haryana-based corporate debtor would go to the NCLT Chandigarh Bench. Before filing, you must serve a demand notice under Section 8. If the buyer replies pointing to a genuine pre-existing dispute, such as quality complaints raised before your notice, the petition will fail, as the Supreme Court explained in Mobilox Innovations v Kirusa Software (2018). And once a petition is admitted, the moratorium under Section 14 stops all other recovery, including your own.

For ?65 lakh, the better routes are usually the Haryana council under the MSMED Act, if your supplies qualify, or a commercial suit in Faridabad if they do not. The council route gives you compound interest at three times the Bank Rate, and an award that the buyer cannot challenge without depositing 75%.

One exception is worth noting. If you learn that another creditor has already pushed the buyer into insolvency before NCLT Chandigarh, you should file your claim with the resolution professional promptly. Claims not submitted and not covered in an approved resolution plan generally cannot be pursued afterwards.

12My Faridabad manufacturing unit has received a Section 13(2) notice from the bank. What should I do in the next sixty days?

Use the sixty days to send a written objection under Section 13(3A) of the SARFAESI Act, and to ask the bank in writing to consider your account under the MSME Revival and Rehabilitation Framework of 29 May 2015.

The notice gives you sixty days to repay before the bank can take measures under Section 13(4), such as taking possession of your factory shed or machinery. During that period, Section 13(3A) lets you make a representation or objection. The bank must consider it and communicate reasons if it rejects it, generally within fifteen days. A well-argued objection pointing to wrong classification of the account, incorrect outstanding figures or procedural defects forces the bank to engage.

The framework matters for a micro or small unit. It requires banks to identify incipient stress in MSME accounts and consider corrective action, including rectification, restructuring or recovery, through a committee mechanism. In Pro Knits v Canara Bank (2024), the Supreme Court held that banks are bound to follow this framework, and that an MSME borrower can insist on its application. The judgment also expects the borrower to raise the point promptly and with supporting material, so attach your Udyam certificate and recent financials to the request.

If the bank proceeds anyway and takes possession, your remedy is an application under Section 17 before DRT Chandigarh, which has jurisdiction over Faridabad. The application must be filed within forty-five days of the measure being taken. The tribunal can examine whether the bank followed the law, including the framework.

Be realistic about the commercial side. Objections buy time and procedural fairness, but they do not erase the debt. Use the period to prepare a credible restructuring or settlement proposal backed by your order book, receivables and cash flow, because a bank is more likely to engage when it sees how the money will come back.

13My Faridabad tool room crossed the small enterprise turnover limit this year and is now classified as medium. Can I still claim delayed-payment interest from buyers?

Not for supplies made while the unit is classified as medium, because the delayed-payment chapter of the MSMED Act protects only micro and small enterprises.

Under the classification limits applicable from April 2025, a small enterprise has investment in plant and machinery up to ?25 crore and turnover up to ?100 crore, and a medium enterprise has investment up to ?125 crore and turnover up to ?500 crore. Once your Udyam record shows medium status, Sections 15 to 24 stop applying to new supplies. You can no longer use the Haryana council for those invoices or claim statutory compound interest on them.

What happens to supplies made while you were still small is a different question. The general approach is that the status on the date of supply governs, so invoices raised while your certificate showed small enterprise status should remain within the Act. Keep a copy of the certificate as it stood at each stage, along with the date on which the upgrade was recorded, because buyers will argue the point if the claim is large.

The upgrade itself happens through the Udyam system based on data drawn from income tax and GST filings. Tool rooms that have a single large order in one year sometimes cross the turnover line and then fall back below it. If that happens, your status may revert, and supplies after the reversion would again be covered.

For medium-status supplies, protect yourself through the contract. Negotiate a clear credit period, a contractual interest rate for late payment, and an arbitration clause that is fair to both sides. Recovery will then be by commercial suit in Faridabad or arbitration under that clause, with Section 12A mediation where it applies. The honest position is that a medium unit has far less statutory protection than a small one, and needs to build that protection into its purchase orders from the start.

14I am a tier-3 supplier of pressed parts in Faridabad. The tier-2 buyer says it will pay me only after the tier-1 company pays it. Is this allowed?

No, a pay-when-paid arrangement does not override Section 15 of the MSMED Act, so your buyer must pay within the agreed period, and in any case within 45 days of acceptance or deemed acceptance.

This is the excuse every small press shop hears. The tier-2 buyer points to its own receivables, says the tier-1 company is delaying, and asks for patience. Commercially it may be true. Legally it is irrelevant. Your contract is with the tier-2 buyer, not with the company above it. The obligation to pay arises once your parts are accepted, and Section 24 makes any contrary clause in the purchase order ineffective to the extent it conflicts with the Act.

So even if your purchase order carries a clause saying payment will be released only on receipt from the end customer, the 45-day limit still applies. Interest at three times the Bank Rate, compounded monthly, starts running from the due date. The buyer cannot claim that interest as a deduction for income-tax purposes because of Section 23, and under Section 43B(h) of the Income-tax Act it cannot deduct the unpaid purchase amount in the relevant year either.

Advocate BK Singh often advises suppliers in this position to keep the relationship going while building the record. Send a polite but firm letter pointing out the 45-day limit and the interest position. Ask for a ledger confirmation. Keep supplying if the business makes sense, but document every delay. If the delays continue, the record will support a council reference.

There is one commercial judgement to make. If the tier-2 buyer is itself struggling, a claim may push it into difficulty, and recovering from an insolvent buyer is slow. Watch for warning signs such as bounced cheques, staff leaving or sudden changes in payment patterns, and act earlier rather than later if they appear.

15A Faridabad buyer is holding back 10% retention on my electrical panel invoices until commissioning. Is retention covered by the 45-day rule?

It depends on what was agreed and when the panels were accepted, but retention held back without a genuine contractual basis linked to acceptance is usually treated as part of the amount due under the Act.

On the other hand, if your contract makes commissioning by you a part of the scope, and commissioning has not happened because your own team has not completed testing, the buyer has a stronger argument that the supply is not complete. Read the scope of work closely. Supply only, supply and installation, and supply with commissioning are treated differently.

In practice, the council looks at the documents. A commissioning certificate, a site handover note or emails showing the panels running at the site are powerful evidence. So is the absence of any defect complaint over months. Where the retention has been held for a year or more after commissioning, the case for its release with statutory interest is strong.

The practical step is to prepare a separate schedule of retention amounts, invoice by invoice, showing the delivery date, the commissioning date if known, and the period of withholding. Claim them as part of the reference, but be ready to concede retention on panels where your own commissioning work is genuinely incomplete. Pressing weak items alongside strong ones can cost you credibility with the council.

16My Faridabad buyer finally paid the principal but refuses to pay any interest for the delay. Can I still claim the interest alone?

Yes, you can claim the statutory interest alone, because Section 17 of the MSMED Act makes the buyer liable for the amount with interest, and payment of the principal does not wipe out the interest that has already accrued.

Many Faridabad units let the interest go once the principal arrives, either from relief or to protect the relationship. That is a commercial choice. Legally, interest under Section 16 accrues from the due date at three times the Bank Rate, compounded monthly, until payment. If an invoice of ?9 lakh was paid fourteen months late, the interest at the current rate of 1.4375% a month compounded would be roughly ?1,99,062. A claim for that amount can be referred to the Haryana council as a standalone claim.

The buyer will usually argue that you accepted the principal without protest and therefore waived interest. That argument depends on what you actually did. If you issued a receipt saying full and final settlement, or signed a ledger confirmation showing a nil balance, the buyer has something to work with. If you simply accepted the money and your books show interest as outstanding, the waiver argument is weak, given the overriding effect of Section 24.

To protect the interest claim, write to the buyer soon after receiving the principal. Say that the payment has been applied against the principal, that statutory interest remains due, and attach a calculation. Do not use the words full and final in any receipt.

Limitation is the main risk. Interest claims are subject to the same limitation rules as the principal, generally three years from when the amount fell due, extended by acknowledgments in writing. If the principal was paid two and a half years after the due date, the interest on earlier invoices may already be close to the limit. Act quickly rather than waiting to see whether the buyer will pay voluntarily.

17How long does the Haryana council usually take to decide a delayed-payment case filed by a Faridabad supplier?

The process has two stages. First, the council conducts conciliation, either itself or through an institution it refers the matter to. The buyer is called, and the parties try to reach a settlement. If conciliation fails, the council takes up the dispute as an arbitration or refers it to an arbitral institution. The arbitration stage involves pleadings, documents, sometimes witness evidence, and arguments before an award is passed.

The things that slow a matter down are mostly predictable. A buyer who seeks repeated adjournments, raises jurisdictional objections, files a counterclaim or challenges your registration status will add months. A claim with a messy ledger, missing GRNs or a disputed amount will also take longer, because the council has to resolve the figures. A clean claim against a buyer who engages seriously at conciliation can settle at the first or second sitting.

So the controllable factor is the quality of your filing. A reference that sets out each invoice, the delivery and acceptance dates, the payment received, the due date and the interest calculation in a single schedule, with supporting documents indexed behind it, gives the council little reason to call for more. Respond quickly to every notice and turn up prepared to every sitting.

While the matter is pending, keep the buyer relationship in view. If you are still supplying, document every new delivery and payment, because these can be brought into the same proceedings or a fresh reference. If the buyer settles midway, record the terms in writing and ask the council to note the settlement, so that the terms can be enforced if the buyer later defaults on the instalments.

18What documents does a Faridabad forging unit need to collect before filing a claim with the Haryana council?

Then collect correspondence. Emails about rejections, delivery delays, payment follow-ups, promises to pay and any disputes over price or quality. Advocate BK Singh usually asks clients to export the entire email thread with the buyer for the period, rather than selected messages, because a selective file invites the question of what was left out.

One practical tip: forging units often supply against monthly schedules with part deliveries. Reconcile each part delivery against the invoice it was billed on, so there is no confusion about which delivery is unpaid. That reconciliation, prepared before filing, will save time at every later stage of the case.

19I have a council award for my Faridabad unit against a buyer whose plant and bank accounts are in Gujarat. Do I have to execute it in Faridabad first?

This saves considerable time. The older practice of first filing in the home court and then seeking a transfer added months. Going straight to the place where the assets are means attachment orders can be obtained against the bank accounts or debtors that actually matter.

20My Faridabad buyer seems to be shifting machinery out of its plant while my dues are unpaid. Can I stop it before the case is decided?

You can apply for interim protection, either under Section 9 of the Arbitration Act if your claim is before the Haryana council, or under Order XXXVIII of the Code of Civil Procedure if you have filed a suit.

Section 9 allows a party to arbitration proceedings to seek interim measures from the court, including securing the amount in dispute or restraining the disposal of assets. Where a reference is pending before the council, an application can be moved in the competent court in Faridabad. The court will want to see a strong prima facie case, a real risk that the buyer will dispose of its assets to defeat any award, and that the balance of convenience favours protection.

Order XXXVIII Rule 5 allows a court in a pending suit to order a defendant to furnish security or attach its property before judgment, if the defendant is about to dispose of or remove its property with intent to obstruct the decree. The threshold is high. Courts do not grant attachment merely because a debtor owes money. You must show specific conduct suggesting an intention to defeat the decree.

Evidence is everything here. Photographs or videos of machinery being loaded, statements from transporters or staff, notices of closure, sudden sale of property or changes in registered address are the kind of material that persuades a court. A general apprehension will not.

Act quickly. Once machinery is gone and the plant is empty, an order has little practical value. If you are seeing signs that a buyer is winding down, gather the evidence and move the application within days, not weeks. The application can be filed even before the main claim is fully prepared, provided the main proceedings are started within the time the court allows. Being fast matters more than being perfect at this stage.

21Can I mention Section 43B(h) to my Faridabad buyer to get paid faster, and will it actually help?

Yes, mentioning Section 43B(h) of the Income-tax Act is legitimate and often helps. It means the buyer cannot claim a deduction for the purchase amount in a given year unless it pays a micro or small supplier within the MSMED Act time limit.

So a polite reminder that your unit is registered as micro or small, that payment beyond 45 days triggers Section 43B(h), and that you would like the invoices cleared before the financial year closes, can produce results. Many finance teams prioritise MSME payments around March for exactly this reason.

Be aware of the limits. Section 43B(h) does not apply to traders, and it does not apply to medium enterprises. It also does not give you a right to sue. It is a pressure point, not a remedy. If the buyer pays late despite the tax hit, you still need the council or the courts to recover the money. The buyer is also required to disclose delayed MSME payments in its MSME Form I returns and its accounts under Section 22, which you can mention as part of the same reminder.

22Can my Faridabad unit go straight to the Punjab and Haryana High Court if the Haryana council is not acting on my reference?

A writ petition before the Punjab and Haryana High Court is possible only in limited situations, such as a long failure by the council to take up a reference at all. It is not a substitute for the statutory remedies.

What a writ cannot ordinarily do is decide the dispute on merits. The High Court will not usually calculate interest, examine invoices or decide quality disputes in writ proceedings. Nor is a writ the right route against an award, where Section 34 provides a specific remedy subject to the Section 19 pre-deposit. Buyers who try to avoid the pre-deposit by filing writs against council awards generally find the High Court sending them back to the statutory route.

Before considering a writ, exhaust the practical steps. Write to the council asking for a hearing date, enclosing proof of filing. Follow up in person if needed. Keep a record of every reminder. A writ petition backed by a clear chronology of filing and follow-up is far more persuasive than one filed after a single unanswered letter.

There is also a cost to weigh. A writ adds a layer of litigation and expense, and the result is usually a direction to the council rather than money in your account. Use it when the delay is genuinely extraordinary and other methods have failed, not as a shortcut.

23I have unpaid invoices from four years ago with a Faridabad buyer. Is it too late to take them to the Haryana council?

It may be too late for some invoices, because claims are generally barred three years after they fall due unless the period has been extended. The Supreme Court held in Silpi Industries (2021) that the Limitation Act applies to arbitration proceedings before the council.

The three years run from the due date of each invoice. An invoice raised four years ago, with a 45-day due date, would ordinarily be barred unless something has extended limitation. The good news is that suppliers often have more than they realise. Under the Limitation Act, a written acknowledgment of the debt signed by the buyer before the period expires starts a fresh period from the date of acknowledgment. A part payment made before expiry, if evidenced in writing by the buyer, has a similar effect.

Running accounts deserve particular attention. Where supplies and payments have continued on a single running account, the analysis can differ from that for isolated invoices, and the date of the last payment or last acknowledgment becomes important.

The practical step is to prepare a chronology for each old invoice: the due date, every payment, every acknowledgment and the date of each document. Then decide which invoices remain within time and which do not. File for those within time without further delay, because each month that passes may push another invoice past the limit. For invoices that are genuinely barred, accept the position rather than weakening the overall claim by including them.

24My Faridabad buyer has filed a counterclaim for late delivery penalties in my council case. Can the council hear that?

Liquidated damages are governed by Section 74 of the Contract Act. Where the contract names a sum or rate as damages for delay, the buyer can claim reasonable compensation up to that sum, but the courts generally expect some proof that loss was actually caused or that it is of a kind not easily proved. A clause allowing 1% per week of delay, capped at 10%, does not automatically entitle the buyer to the full 10%. It must still show the delay was attributable to you.

Prepare a delivery chronology showing the scheduled date, the actual date and the reason for any gap, with documents for each. It is the single most effective answer to a delay counterclaim, and it is far easier to build before the hearing than during it.

25

A clause letting one party alone appoint the sole arbitrator is now on very weak ground. A Constitution Bench of the Supreme Court in CORE v ECI SPIC SMO MCML (JV) (2024) held that unilateral appointment clauses offend the principle of equal treatment of parties.

The judgment recognised that party autonomy allows parties to design their arbitration agreements, but held that a clause giving one party the exclusive power to appoint a sole arbitrator undermines impartiality and equality. Where such a clause exists, the other party can ask the court to appoint an independent arbitrator under Section 11 of the Arbitration Act. The ruling applies prospectively to appointments made after the date of the judgment, so older appointments may be treated differently.

The clause still matters for claims that fall outside the council, such as disputes about tooling ownership, development charges, or supplies made before your Udyam registration. For those, if the buyer appoints an arbitrator on its own, object in writing at once and, if needed, apply under Section 11 for an independent appointment.

The best long-term fix is in the contract. When the buyer next sends a purchase order or a vendor agreement for signature, ask for the arbitration clause to provide for appointment by mutual consent or by an arbitral institution. Many buyers will agree once the CORE ruling is pointed out, because their own lawyers know a unilateral clause may not survive scrutiny.

26My Faridabad unit supplies machined parts to a public sector undertaking. Does the MSMED Act apply to government buyers?

The MSMED Act applies to public sector undertakings and government buyers, because the definition of buyer in Section 2(d) covers anyone who buys goods or receives services from a supplier for consideration, without excluding the state.

Many Faridabad engineering units supply to railway workshops, defence establishments, power utilities and other public sector companies. These buyers often pay late, citing internal approvals, budget releases, pending inspection reports or audit queries. None of these reasons extends the 45-day limit under Section 15. Statutory interest at three times the Bank Rate runs from the due date, and a reference can be made to the Haryana council against a public sector buyer in the same way as against a private one.

Public sector buyers do tend to defend matters more formally. Expect detailed objections, reliance on the general conditions of contract, arguments that inspection by a nominated agency is the true acceptance date, and sometimes a claim that internal approval processes must be completed before payment. The inspection argument deserves attention. If the contract makes acceptance subject to inspection by a nominated inspector, the date of the inspection certificate may well be treated as the acceptance date, rather than the date of delivery.

If you choose to sue rather than approach the council, Section 80 of the Code of Civil Procedure requires a two-month notice before filing a suit against the government or a public officer. That requirement does not apply to a council reference, and it does not apply to companies that are merely government-owned, though many lawyers send a notice anyway as a matter of caution.

Practically, keep every inspection certificate, dispatch clearance and receipt note, and track the date on which each bill was submitted to the paying office. Public sector payment delays often happen at the bill-processing stage, and your records will show exactly where the delay lay.

27I trade steel sheets and coils from a godown in Faridabad and sell to fabricators. Can I use the MSMED Act to recover unpaid bills?

Usually not. Since 2021 traders have been brought under Udyam only for priority sector lending, so they do not get the benefit of the delayed-payment provisions of the MSMED Act for their trading supplies.

The 2021 change allowed retail and wholesale traders to register on Udyam so that banks could count their loans towards priority sector targets. It did not extend Sections 15 to 24 to them. So a steel trader in Faridabad buying from mills or stockists and reselling sheets, coils or plates to fabricators cannot take a delayed-payment claim to the Haryana council for those sales, and cannot claim compound interest at three times the Bank Rate.

The position changes if you do processing that amounts to manufacturing or a service. A unit that cuts coils to length, slits them, shears plates to size or does profile cutting may have a genuine manufacturing or service activity alongside its trading. If that activity is properly registered and invoiced separately, those invoices may fall within the Act. Mixing trading and processing in one invoice without breaking out the charges makes the argument much harder.

For pure trading supplies, the routes are ordinary civil remedies. A commercial suit in Faridabad, with Section 12A mediation first for claims of ?3 lakh and above, is the main option. A summary suit under Order XXXVII works well where you have invoices and ledger confirmations signed by the buyer. If a cheque has bounced, a Section 138 complaint is available. As an unpaid seller under the Sale of Goods Act, you may also hold a lien over goods still in your possession and, if the buyer becomes insolvent, stop goods already in transit.

The honest advice is to protect your trading business through contract terms and credit control: fixed credit periods, a contractual interest rate, post-dated cheques where customary, and a hard stop on further supply when a buyer crosses its limit.

28My Faridabad unit takes most orders on WhatsApp without formal purchase orders. Can I still make a claim before the Haryana council?

A claim can succeed without formal purchase orders, because the council looks at whether goods or services were actually supplied and accepted, and WhatsApp messages can be good evidence of the order.

Advocate BK Singh usually asks clients to prepare a table linking each WhatsApp order to its invoice and delivery documents before the reference is drafted. That table becomes the backbone of the claim and makes it easy for the council to follow the trail.

Electronic records will need to be proved in the proper manner, including a certificate where the law requires one. Your lawyer will advise on the form. Going forward, a simple step helps: after each WhatsApp order, send a short email confirming the quantity, price and delivery date. It costs nothing and gives you a cleaner record if a dispute ever arises.

29Should a Faridabad supplier send a legal notice to the buyer before filing a reference with the Haryana council?

A legal notice is not legally required before a council reference, but sending one is usually sensible, because it puts the buyer on record, often prompts payment and sharpens the dispute before filing.

The reply is often the most useful part. A buyer who replies disputing quality for the first time, months after delivery, has effectively admitted that no written objection was raised within fifteen days. A buyer who replies asking for time has acknowledged the debt, which can help on limitation. A buyer who does not reply at all looks unreasonable when the council later asks why it never responded.

There are situations where a notice is unwise. If you fear the buyer will remove assets, hide stock or shift bank accounts once warned, you may want to file first and seek interim relief at the same time. If the buyer is likely to rush to file a counterclaim or a private arbitration to pre-empt you, filing first may be better.

Where a cheque has bounced, the position is different. A notice within 30 days of the return memo is mandatory under Section 138 of the Negotiable Instruments Act, and you must send it whatever your strategy on the council claim. Similarly, if you plan to sue a government department, Section 80 CPC requires notice. In every case, keep proof of dispatch and delivery, because these may be challenged later.

30I need an MSME lawyer for a Faridabad recovery matter. How are Faridabad cases handled and what should I bring to the first meeting?

Faridabad matters are handled from the Dwarka office in New Delhi. For the first meeting, bring your Udyam certificate, the unpaid invoices, delivery and acceptance documents, a ledger statement and the email or WhatsApp correspondence with the buyer.

The first meeting is about understanding the claim and choosing the right route. Advocate BK Singh, who practises in MSME and Facilitation Council matters, commercial litigation, recovery and arbitration, and appears before the Supreme Court, High Courts, DRT and DRAT, NCLT and commercial courts, usually starts by reconciling the invoices against the ledger and checking the registration dates. That quickly shows whether the claim belongs before the Haryana council, the Commercial Court in Faridabad, or a combination of routes.

You do not need to travel each time. Many Faridabad clients send documents in advance by email and attend the first discussion by video call, coming to the office only when originals must be inspected or affidavits signed. The Legals365 team of more than fifty advocates allows hearings before the Haryana council, the Faridabad courts, the Punjab and Haryana High Court, DRT Chandigarh and NCLT Chandigarh to be attended without long gaps between dates.

Prepare a short note before the meeting. Set out who the buyer is, what you supplied, when the payments stopped, what reasons the buyer gave and whether any cheques bounced. Mention any quality complaints honestly, even if you think they are baseless, because a defence that surfaces later is harder to deal with than one known at the start.

Be realistic about outcomes. No lawyer can promise a result or a timeline, and the Bar Council rules prohibit such promises. What a careful lawyer can do is tell you the strengths and weaknesses of your claim, the likely objections and the order in which the routes should be tried, so that you make decisions with a clear view of the risks.

General information under the Bar Council of India Rules, not legal advice. The outcome of any matter depends on its own facts and documents.