Read professional answers from experienced MSME lawyers for MSME disputes, complaints, compensation claims, refunds, service deficiency matters, and other legal issues.
600 detailed answers from Advocate BK Singh and the Legals365 team on delayed payments, MSEFC claims, Udyam, notices, arbitration and recovery across Delhi NCR. Pick a city, a law or a service to read its questions.
By Law Type
20 questions answered
MSME Samadhaan is the Central Government's online window through which a micro or small supplier lodges a delayed payment application against a buyer, which is then placed before the Facilitation Council of the relevant state. The portal itself decides nothing.
That last point is where most owners get confused. Samadhaan is a filing and tracking mechanism. The legal machinery sits in the MSMED Act, 2006: Section 15 requires the buyer to pay within the agreed period and never beyond 45 days from acceptance or deemed acceptance, Section 16 adds compound interest with monthly rests at three times the RBI Bank Rate, and Section 18 lets the supplier refer the dispute to the council. The portal is one way of making that reference, and it also lets the government see how many cases are pending against which buyers, including central ministries and public sector units.
In practice you enter your Udyam number, the buyer's details, the invoices that remain unpaid and the amount you claim. The application becomes visible to the council's office, which scrutinises it and decides whether to register it as a reference. Once registered, the case runs as an ordinary Section 18 matter: notice to the buyer, conciliation and, if that fails, arbitration by the council itself or by an institution it nominates.
What the portal cannot do is cure a weak claim. If your Udyam registration post-dates the contract, if you are registered only as a trader, or if your invoices are not backed by delivery challans, GRNs or acceptance emails, the filing will stall at scrutiny or fail later at the hearing. Treat the online form as the cover page of a legal case rather than a complaint box. Before filing, reconcile your ledger with the buyer's last balance confirmation so the figure you enter can be defended invoice by invoice.
Only a micro or small enterprise holding a valid Udyam registration, which was registered when it contracted with the buyer for the unpaid supplies, can file a delayed payment application on Samadhaan.
Each element matters. The supplier has to fall within Section 2(n) of the MSMED Act, which for this chapter means a micro or small enterprise. Medium enterprises appear on Udyam and enjoy several government schemes, but the delayed payment provisions in Sections 15 to 24 were never extended to them. Classification is read from your Udyam record, so a unit that has drifted into the medium band on investment or turnover should check its current status before filing.
The buyer, under Section 2(d), is anyone who buys goods or receives services from the supplier for consideration. That covers private companies, partnership firms, proprietors, government departments and public sector undertakings. A buyer gets no exemption simply because it is large or owned by the state.
Timing is the third filter. In Silpi Industries (2021) the Supreme Court tied the benefit of the Act to registration at the time of the contract, and supplies made before registration are not covered. A firm that registered in March cannot use Samadhaan for a purchase order accepted the previous December, though it may still sue for that money in a commercial court.
Traders form the fourth group to watch. Since 2021 retail and wholesale traders may register on Udyam, but only for priority sector lending. They cannot invoke Section 18 for delayed payments, and an application from a trader-only registration will usually be rejected at scrutiny.
Advocate BK Singh usually asks a new client for three documents before deciding whether Samadhaan is the right door: the Udyam certificate with its date and NIC codes, the purchase order behind the oldest unpaid invoice, and the buyer's latest ledger confirmation. Those three papers answer the eligibility question in most cases.
A medium enterprise cannot use Samadhaan or the council route for delayed payments, because Sections 15 to 24 of the MSMED Act protect only micro and small suppliers. The portal is built around that limit.
Under the classification in force from April 2025, a small enterprise has investment up to ?25 crore and turnover up to ?100 crore, while a medium enterprise goes up to ?125 crore and ?500 crore. Plenty of established manufacturers in the NCR cross the small ceiling on turnover long before they think of themselves as large. Once your Udyam record shows medium, the council will not register a reference from you, however strong the debt.
A harder question arises when the unit was small when it took the order and became medium later. The better view is that status at the time of contract and supply governs, since that is when the statutory rights attached. Expect the buyer to argue otherwise, and keep the old Udyam print, the ITR and the GST returns for that year on file so the earlier classification can be proved.
If the council is closed to you, the money is still recoverable through other routes. A commercial suit is the usual one, preceded by pre-institution mediation under Section 12A of the Commercial Courts Act where the claim is ?3 lakh or more, as Patil Automation v Rakheja Engineers (2022) made mandatory. Where you hold a written contract or an acknowledged invoice, an Order XXXVII summary suit puts pressure on the buyer to seek leave to defend. A bounced cheque opens Section 138 of the NI Act. If the undisputed default is ?1 crore or more, a Section 8 demand notice under the IBC may bring a serious buyer to the table.
What a medium enterprise loses is the Section 16 compound interest and the 75% pre-deposit under Section 19. Contractual interest and interest under the CPC remain available, so make sure your invoices and purchase orders actually provide for it.
They are related but not identical. Samadhaan is the older window for filing and tracking delayed payment references, while the ODR facility is the newer arrangement for conducting the dispute itself online, including conciliation and, where the council chooses, arbitration.
Think of Samadhaan as the registry counter and ODR as the hearing room. When Samadhaan was introduced, the application went online but the case that followed was largely conducted on paper: physical notices, adjourned hearings, bundles of invoices carried to the council's office. The online dispute resolution facility was introduced to move the proceedings themselves onto a digital platform, so that pleadings, documents and conciliation sessions can be handled without both sides travelling to the council every few weeks.
The law does not change with the platform. Whichever system carries your case, the rights come from the MSMED Act: the 45-day cap in Section 15, interest under Section 16, the amount due under Section 17 and the reference under Section 18. Jurisdiction stays with the council where the supplier is located, as Section 18(4) provides. An award made through an online process is challenged and enforced exactly as any other council award.
Which one you use is often not your choice. States have adopted the online facility at different speeds, and some councils route every fresh reference through it while others still accept applications in the older way. Before filing, check what your own council currently requires, because a filing on the wrong channel can sit unnoticed. Advocate BK Singh's team checks this afresh for each matter rather than relying on how the last case went.
One honest limit: neither system speeds up a buyer who is determined to delay. Online hearings reduce adjournments caused by travel and missing files, but a well-advised buyer can still raise jurisdiction objections, file a counterclaim and seek time. The quality of your documents decides far more than the portal does.
After filing, the council's office scrutinises the application, registers it as a reference if it is complete and within the Act, issues notice to the buyer and then lists the matter for conciliation under Section 18(2).
Scrutiny is the first gate and the one most owners underestimate. The office checks that your Udyam registration shows micro or small, that the registration predates the contract, that the claim relates to supplies of goods or services rather than a loan or a security deposit, and that the council has jurisdiction because you are located in that state. Gaps lead to the application being returned or kept pending for clarification.
Once the buyer receives notice, it usually files a reply. Expect the familiar defences: goods were defective, delivery was late, the invoice was never accepted, a debit note was raised, or the supplier is not really a micro or small enterprise. Since Silpi Industries (2021), the buyer may also bring a counterclaim, for example for liquidated damages or rejected material.
Conciliation follows. The council, or a person or institution it appoints, tries to get the parties to agree. Many cases settle here, often with the buyer paying the principal and negotiating on interest. If conciliation fails, the council takes up the dispute itself as arbitrator or refers it to an arbitral institution under Section 18(3), and the Arbitration and Conciliation Act then applies as if there were an arbitration agreement.
The arbitration ends in an award stating the principal, the Section 16 interest and costs. A buyer who wants to challenge it under Section 34 must first deposit 75% of the awarded amount, as Section 19 requires and as Goodyear India v Norton Intech (2012) confirmed. If there is no challenge, or the challenge fails, the award is enforced like a decree.
How long all this takes varies widely between councils and depends heavily on the buyer's conduct. Keep your documents organised from day one, because delay at the hearing stage usually traces back to a missing GRN or an unreconciled ledger.
Most Samadhaan applications fail for avoidable reasons: a registration dated after the contract, a trader or medium classification, a claim that is not for supplies, the wrong council, or an amount that cannot be matched to invoices.
The registration date problem is the commonest. Suppliers often obtain Udyam only after a buyer stops paying, then file for the whole outstanding balance. Following Silpi Industries (2021), supplies under contracts made before registration fall outside the Act, so the council will either reject the application or carve those invoices out. Check the date on your certificate against the purchase orders before anything else.
Classification comes next. A trader-only registration gives priority sector lending benefits and nothing more, since the 2021 change did not extend Section 18 to traders. A medium enterprise is outside the delayed payment chapter altogether. Wrong NIC codes cause similar trouble, for instance a fabricator registered under a wholesale trade code.
The nature of the claim also matters. Councils deal with the price of goods supplied or services rendered. Refund of a security deposit, return of an advance, a loan to a related company or damages for wrongful termination of a contract are not delayed payments for supplies, and claims padded with such items attract objections.
Jurisdiction trips up multi-state businesses. Section 18(4) gives jurisdiction to the council where the supplier is located, so filing in the buyer's state is a mistake, and so is filing from a branch that holds no registration.
Finally, the numbers. An application claiming a round figure with no invoice schedule, or one that ignores the buyer's debit notes and part payments, invites a return for clarification. Advocate BK Singh usually prepares an invoice-wise schedule showing date of supply, date of acceptance, amount received and balance before the online form is touched. It is tedious work, but it is the single best protection against a filing that sits pending for months.
As a pure trader you cannot use Samadhaan or the Facilitation Council to recover dues, because traders were brought onto Udyam in 2021 only for priority sector lending, not for the delayed payment protection in the MSMED Act.
The background explains the restriction. Udyam was originally designed for manufacturing and service enterprises. When the government allowed retail and wholesale traders to register in 2021, the clarification was specific: the benefit was limited to priority sector lending by banks. The council route under Section 18, the 45-day cap in Section 15 and the compound interest in Section 16 remained reserved for micro and small manufacturers and service providers.
In practice councils check the NIC codes on the registration. If every activity listed is wholesale or retail trade, the application is likely to be rejected at scrutiny. Some traders try to describe their business as a service, for example by calling distribution a logistics activity, but a council or a court looks at what was actually supplied. Reselling packaged goods bought from a manufacturer is trading, whatever the code says.
The position differs where the business genuinely does more than resell. A firm that cuts, assembles, processes or packs goods before selling them may carry on manufacturing, and a firm that installs, repairs or maintains equipment renders services. If your registration correctly records such an activity and the unpaid invoices relate to it, the council may be open to you for those invoices. Mixed invoices, part trading and part service, are messy and best separated before filing.
For straightforward trading dues the realistic routes are a demand notice followed by a commercial suit, with Section 12A mediation first where the claim is ?3 lakh or more, an Order XXXVII summary suit if the documents support it, or a Section 138 complaint if the retailer's cheque has bounced. None of these carry the statutory interest rate, so make sure your invoices state an interest term.
You can file on Samadhaan yourself; the portal was designed so that a proprietor or accountant could submit an application without a lawyer. Whether you should depends on the size of the claim and how hard the buyer is likely to fight.
For a modest, clean claim against a buyer who simply pays late, self-filing often works. You have a valid Udyam certificate dated before the purchase order, invoices backed by delivery challans and GRNs, and a buyer who has never disputed quality. The council issues notice, the buyer turns up at conciliation, and the matter settles. Many such cases never need legal drafting.
The picture changes once the buyer engages counsel. Expect objections that your registration is defective, that the supplies predate it, that a private arbitration clause in the purchase order excludes the council, or that there was a quality dispute recorded in emails. A counterclaim for liquidated damages may follow. At that stage the case is a statutory arbitration, and the written claim, the evidence affidavit and the legal submissions decide the outcome. An owner who filed a two-line application with a round figure is at a disadvantage.
There is also the question of what you claim. Self-filed applications routinely understate interest by calculating it simply rather than with monthly rests under Section 16, or overstate it by running it from the invoice date rather than from the appointed day under Section 2(b). Both mistakes cost money or credibility.
A sensible middle path is to have the application and the invoice schedule reviewed before filing, then decide on representation once the buyer's reply is in. Advocate BK Singh and the Legals365 team, which includes more than fifty advocates, handle council matters at every stage from drafting the first application to defending the award in court, but plenty of small claims are best run by the owner with advice in the background.
A Samadhaan application that sits without movement is usually either awaiting scrutiny at an overloaded council or has been informally held back for a defect nobody has told you about. Your first step is to find out which.
Start with the council's office. Write to it, quoting your application number, and ask whether the application has been registered as a reference and, if not, what is pending. Keep the letter short and factual. In many cases the reply reveals a missing document, a query about the Udyam date or a question about jurisdiction that can be answered in a day.
If the application has been registered but no hearing has been fixed, a written request for listing, with a copy of the unpaid invoice schedule, helps. The MSMED Act expects councils to act promptly, and the statute sets a short period for completing a reference. That expectation is not always met in practice, but a polite reminder citing it usually draws attention to the file.
Persistent inaction is a different matter. Where a council neither registers nor rejects an application for a long period, a writ petition before the High Court seeking a direction to decide the reference is available in principle. It is a serious step, it costs time and money, and courts generally expect you to have pursued the council first. Reserve it for large claims where the delay is causing real harm.
Meanwhile, watch limitation. A pending online application is not a reason to let three years pass from the due date of an invoice without protecting your position. Ask the buyer for a ledger confirmation, which acts as a written acknowledgement and restarts the period, and consider a parallel demand notice.
Advocate BK Singh's practice is to diarise a follow-up date when the application is filed rather than waiting for the council to make contact. Most stalled files are revived by a well-drafted letter, not by litigation.
Invoices for supplies made before you held a Udyam registration are generally outside the MSMED Act, so a Samadhaan application covering them is likely to be rejected or cut down to the post-registration invoices.
The principle comes from Silpi Industries (2021), where the Supreme Court held that a supplier must have been registered when the contract was entered into to claim the Act's benefits for supplies under that contract. The Act is protective legislation for enterprises that have declared their status, and a buyer cannot be expected to pay compound interest at three times the Bank Rate under a regime that did not apply when the deal was struck.
A typical case: a Delhi fabrication unit supplies a contractor from 2023 onwards on running purchase orders, registers on Udyam in mid-2025 after payments dry up, and files for the full outstanding of ?40 lakh. On scrutiny, or later at the hearing, the council separates the invoices. Supplies under purchase orders issued after registration remain in the reference. The older ones are excluded.
Running accounts make this untidy. Part payments are often adjusted against the oldest invoices first, which may leave only recent, post-registration bills outstanding. That helps the supplier. A buyer will argue the opposite appropriation. Check how the buyer's ledger records receipts before deciding what to claim, and do not inflate the claim with pre-registration bills hoping they will slip through, because they damage the credibility of the rest.
The excluded invoices are not lost. They can be recovered through a commercial suit, with pre-institution mediation under Section 12A first where the amount is ?3 lakh or more, or through an Order XXXVII summary suit if the paperwork supports it. You simply lose the statutory interest and the Section 19 pre-deposit on those bills. Watch limitation on them separately, because the council reference does nothing to protect claims it cannot hear.
The Delhi council will hear it. Section 18(4) of the MSMED Act gives jurisdiction to the Facilitation Council of the state where the supplier is located, wherever the buyer happens to be.
The provision was written precisely for this situation. A small supplier should not have to chase a large buyer across the country, so the statute brings the buyer to the supplier's home council. On Samadhaan, the application is routed by the supplier's location, and the buyer receives notice from that council. The buyer must then respond and appear, either in person, through counsel or through the online facility where the council has adopted it.
Difficulties arise in a few recurring patterns. If your Udyam registration shows the unit in Haryana but you run the business from a Delhi office, the buyer will argue that you are located in Haryana. If the supplies were made from a second unit registered under the same Udyam number, the location of that unit may be relevant. Keep the registration accurate, because the council looks at where the enterprise is actually established.
A private arbitration clause naming another seat does not displace Section 18(4). In Gujarat State Civil Supplies v Mahakali Foods (2022) the Supreme Court held that the MSMED Act, being a special law with an overriding provision in Section 24, prevails over an arbitration agreement between the parties, so the council route remains open.
The buyer may still delay by filing objections or seeking to have the matter transferred. Those objections rarely succeed where the supplier is genuinely located in the council's state, but they take time. After the award, enforcement happens where the buyer's assets are. Under Sundaram Finance v Abdul Samad (2018) the award holder can file for execution directly in the court within whose jurisdiction those assets lie, without first obtaining a transfer from the Delhi court, which removes one layer of delay at the recovery stage.
Filing on Samadhaan does not freeze limitation indefinitely, and you should not treat a pending application as protection for invoices that are approaching three years from their due date.
Silpi Industries (2021) settled that the Limitation Act applies to arbitration under Section 18 of the MSMED Act. A claim that would be time-barred in a civil court is therefore at risk before the council too. For a supply of goods or services on credit, the ordinary period for recovering the price is three years, and for MSME purposes it is safest to count from the date payment fell due under Section 15.
The harder question is which date stops the clock. Is it the day you submitted the online form, the day the council registered the reference, or the day arbitration actually commenced after conciliation failed. Councils and courts have not always answered this the same way, and the answer can depend on the facts. Prudence suggests assuming the least favourable date and acting well before the deadline.
Two practical habits keep you safe. First, ask for balance confirmations. A ledger confirmation signed by the buyer before the period expires is a written acknowledgement and starts a fresh period from its date. Many buyers sign these routinely at year end for their own audit, and suppliers forget to keep them. Second, keep proof of every filing step: the Samadhaan acknowledgement, the council's registration letter and any notice issued.
Where an invoice is close to expiring and the council has not yet registered the reference, consider a parallel step that unquestionably stops time, such as a commercial suit for that invoice alone. It looks like duplication, but losing a ?15 lakh bill to limitation while waiting on scrutiny is a far worse outcome.
A limitation review takes an hour with your ledger and the buyer's confirmations, and it should be done before filing, not after the buyer raises it.
Before filing, assemble your Udyam certificate, the purchase orders or contract, every unpaid invoice with matching delivery challans and GRNs, the buyer's ledger confirmations, and the correspondence that shows acceptance or the absence of any objection.
The Udyam certificate comes first because it answers eligibility. Print the version showing the date of registration, the classification and the NIC codes. If the classification changed over time, keep the earlier record too.
Purchase orders and the contract show when the relationship began and what payment terms were agreed. Section 15 allows a written agreement to fix the payment period, but never beyond 45 days. A purchase order stating 90-day credit does not help the buyer, though you need the document to show when payment fell due.
Invoices should be supported by proof of delivery. For goods, that means delivery challans signed by the buyer's stores, e-way bills and goods receipt notes. For services, use completion certificates, measurement sheets, attendance records or sign-off emails. Under the explanation to Section 2(b), the buyer is deemed to have accepted unless it objected in writing within 15 days, so evidence that no objection came is valuable.
Correspondence often decides contested cases. Keep emails approving samples, chasing dispatches, acknowledging receipt or promising payment. Equally, keep any rejection notes or debit notes the buyer raised, because the council will see them anyway and it is better to address them in the claim.
The ledger is the backbone. Prepare an invoice-wise statement showing date of invoice, date of acceptance, amount, part payments, TDS deducted, debit notes and balance, and reconcile it with the buyer's last confirmation. Then prepare the interest calculation under Section 16, with monthly rests.
Advocate BK Singh insists on this bundle being complete before the online form is filed, because the portal accepts almost anything at submission and the defects surface later, when they are harder to fix. A tidy file also makes conciliation more productive, since the buyer's accounts team can match each figure.
A buyer can ignore the notice, but doing so is unwise, because the council can proceed with conciliation and then arbitration and make an award in the buyer's absence that is enforceable like a court decree.
The notice from the council is not a reminder from the supplier. It is the start of statutory proceedings under Section 18. If the buyer stays away from conciliation, the conciliation simply fails, and the council moves to arbitration under Section 18(3). The Arbitration and Conciliation Act then applies, and a respondent who does not appear after due notice may be proceeded against ex parte. The arbitral tribunal still examines the supplier's evidence, so a claim must be proved, but the buyer loses the chance to contest it.
The consequences of silence become sharp after the award. Section 19 requires a buyer who wants to challenge the award under Section 34 to deposit 75% of the amount awarded first. Goodyear India v Norton Intech (2012) confirmed that the deposit is mandatory. A buyer that ignored the case therefore faces a large deposit before any court will hear it. If it does nothing, the supplier can file for execution under Section 36 and seek attachment of bank accounts, receivables or property.
Buyers ignore notices for predictable reasons. A public sector undertaking's file may sit with the wrong department. A private company may assume the council has no power over it because the buyer is in another state. Some simply hope the supplier will tire. None of these assumptions is safe.
From the supplier's side, make service easy to prove. Give the council the buyer's registered office address, the GST address and the email used for purchase orders. If the buyer later claims it never received notice, these details help defeat an attempt to set aside the award on that ground. Keep your own copies of anything the council dispatches.
You can withdraw the application or record a settlement before the council, but do not withdraw until the money is actually in your account or the settlement is recorded in a form you can enforce.
The commonest mistake in this situation is withdrawing on the strength of a phone call or a letter promising payment in instalments. Once the reference is closed, the buyer's motivation to pay disappears. If it then defaults, you are back at the starting line, possibly with limitation problems and certainly with lost time.
The better approach depends on how far the case has gone. At the conciliation stage, a settlement agreement signed by both parties and recorded by the council has the status of an arbitral award on agreed terms under the Arbitration and Conciliation Act, which means it can be enforced as a decree if the buyer defaults. Once the case is in arbitration, the tribunal can record the settlement as a consent award. Either way you hold something enforceable rather than a promise.
Negotiate the terms with care. Buyers usually offer the principal and ask you to waive interest. That may be commercially sensible, since cash today has value, but understand what you are giving up. Section 16 interest at three times the Bank Rate, currently 17.25% a year compounded monthly, accumulates quickly. A default clause that revives the full claim with interest if any instalment is missed is reasonable and should be insisted on.
Tax points matter too. Section 23 makes the statutory interest non-deductible for the buyer, which some buyers raise as a reason to waive it, and the buyer's Section 43B(h) position may give it its own reasons to settle before the financial year closes.
Advocate BK Singh usually drafts settlement terms so that withdrawal of the reference happens only after the final instalment clears. If instalments are involved, the reference stays alive or a consent award is taken, depending on what the council allows.
The MSMED Act does not require a legal notice before filing on Samadhaan, but in most cases a short demand notice first is sensible, because it often produces payment and it sharpens the dispute for the council.
There is no statutory pre-condition. Section 18 allows any party to a dispute about amounts due under Section 17 to make a reference to the council, and the portal does not ask for a prior notice. Some suppliers file straight away, particularly where the buyer has already said in writing that it will not pay.
A notice nonetheless does several jobs. It tells the buyer that you know your rights under Sections 15 and 16 and intend to use the council, which alone moves many accounts departments. It fixes the amount you claim and invites the buyer to raise any objection now, so you learn its defences before conciliation rather than at it. And if the buyer replies with a part admission, that reply becomes valuable evidence.
The notice should not be a threat letter. It should list the invoices, the dates of supply and acceptance, the payments received, the balance and the interest calculated with monthly rests, and it should give a short period for payment. Mention that the buyer must disclose the dues in its accounts under Section 22, and that Section 43B(h) of the Income-tax Act affects its own deduction. Those two points reach the buyer's finance team rather than its purchase department.
There are cases to skip the notice. If limitation is close, file immediately. If the buyer is in financial difficulty and other creditors are circling, speed matters more than courtesy. If the buyer has already disputed the claim in writing, a notice adds little.
A holder of a dishonoured cheque is in a different position. A Section 138 notice must go within 30 days of the return memo, so that deadline should drive the timing, and the MSMED notice can be combined or sent separately.
Section 16 interest is compound interest with monthly rests at three times the RBI Bank Rate, running from the appointed day or the agreed payment date. With the Bank Rate at 5.75% from 7 October 2026, that is 17.25% a year, or 1.4375% a month compounded.
Take an invoice of ?8,00,000 for goods delivered and accepted. If the purchase order allows 30 days' credit, interest runs from the day after those 30 days. If it allows 90 days, the agreement is overridden by Section 15 and interest runs from the 46th day after acceptance. Where nothing is agreed, the appointed day under Section 2(b) applies, being the day after 15 days from acceptance or deemed acceptance.
Suppose the invoice remains unpaid for ten full months after the date interest begins. The calculation is ?8,00,000 multiplied by 1.014375 raised to the power ten, less the principal. That gives interest of roughly ?1,22,700. A simple calculation at 17.25% for ten months would give ?1,15,000, so the compounding adds about ?7,700 even over this short period, and the gap widens every year the buyer delays.
Section 17 makes the buyer liable for the principal together with this interest. Part payments need care. The general rule is that a payment goes first towards interest accrued and then towards principal unless the parties agreed otherwise, though buyers argue for the reverse. Prepare the calculation invoice by invoice, because each bill has its own acceptance date.
The Bank Rate changes from time to time, and the multiplier applies to the rate in force over each period. Check the rate notified for every stretch of your claim rather than applying today's figure across years, or the buyer's counsel will challenge the arithmetic and you will lose credibility over a few thousand rupees.
Finally, remember that the interest is non-deductible for the buyer under Section 23. That is a useful point in negotiation, but it does not change your entitlement.
Government departments, public sector undertakings and state corporations are buyers under Section 2(d) of the MSMED Act like anyone else, and a micro or small supplier can file a Samadhaan application against them.
In fact, monitoring public sector payment delays was one of the main reasons the portal was created. Central ministries and CPSEs appear on it as respondents, and the data on pending cases against them is visible at an aggregate level. Section 24 gives the Act overriding effect, so a department's internal rules on payment cycles or budget release do not excuse delay beyond the 45-day cap in Section 15.
The practical difficulties are different from those with a private buyer. Government purchase orders often carry detailed conditions on inspection, testing and acceptance, and the buyer will argue that acceptance happened only when a committee signed off, not when the goods reached the store. Read the order closely, because the date of acceptance drives interest. A tender document may also contain an arbitration clause naming a departmental officer as arbitrator. Following Gujarat State Civil Supplies v Mahakali Foods (2022) the council route prevails over such a clause, and after CORE v ECI SPIC SMO MCML (JV) (2024) a unilateral appointment of that kind is itself open to serious challenge.
Expect slow responses. A department's legal cell may take time to engage counsel, and the officer handling the file may change. Persist, and make sure notice goes to the authority that actually signs payments, not merely the indenting office.
Section 80 of the CPC requires two months' notice before suing the government in a civil court. That provision applies to suits, not to a council reference under the MSMED Act, but if you anticipate a suit for invoices outside the Act, serve the notice early.
Advocate BK Singh's experience in council and High Court work points the same way: a government buyer usually pays once the liability is clearly established on record, though rarely before.
Online conciliation is the same statutory conciliation under Section 18(2) of the MSMED Act, conducted through a digital platform instead of across a table at the council's office. The law, the conciliator's role and the outcome do not change.
In general terms, the parties file their claim, reply and documents electronically, and the conciliator holds sessions by video or through the platform's messaging tools. The aim is the same as in a physical sitting: to narrow the dispute, test each side's figures and see whether a settlement is possible. The conciliator may speak to the parties jointly or separately and may suggest terms, but cannot impose them.
The online format suits disputes that turn on documents. If the buyer accepts that goods were delivered and the argument is about deductions, a debit note or the interest figure, a screen-shared ledger reconciliation often achieves more in one session than three physical hearings. It also removes the buyer's favourite adjournment ground, that its officer could not travel.
It suits disputes about quality less well. Where the buyer says a batch of castings failed inspection, the conciliator may want to see test reports, photographs and the rejection note, and both sides may need technical people present. Prepare those materials in advance and upload them in a form that can be viewed easily, rather than as forty unlabelled scans.
Prepare as you would for a physical meeting. Know your bottom line on interest, have authority to settle, and keep your accountant available. Do not make admissions in casual chat messages that you would not make in writing, because the record of an online session can be harder to disown than a remark across a table.
If conciliation succeeds, the settlement is recorded and becomes enforceable as an award on agreed terms. If it fails, the matter moves to arbitration by the council or an institution it nominates, possibly on the same platform. A failed conciliation still has value: you will know exactly what the buyer intends to argue.
A private arbitration clause in the purchase order does not prevent a micro or small supplier from filing on Samadhaan, because the MSMED Act overrides such agreements and the council route remains available.
The point was settled in Gujarat State Civil Supplies v Mahakali Foods (2022). The Supreme Court held that Chapter V of the MSMED Act, read with the overriding effect in Section 24, prevails over an arbitration agreement between the parties. Once a supplier makes a reference under Section 18, the council's jurisdiction is not ousted by a clause naming some other arbitrator, institution or seat. Buyers still raise the clause in their reply, but the objection generally fails if you are otherwise eligible.
The clause does matter in two situations. First, if you are not eligible for the Act, for example because the contract predates your registration or you are a trader, the arbitration clause governs the dispute and you will be expected to arbitrate as the contract says. Second, if the buyer started arbitration under the clause before you approached the council, there may be argument about which proceeding should continue. Move promptly once a dispute crystallises.
Many purchase orders let the buyer's own managing director or a nominee appoint a sole arbitrator. In CORE v ECI SPIC SMO MCML (JV) (2024) a Constitution Bench held that unilateral appointment clauses of this kind offend the principle of equal treatment of parties. That gives a supplier a strong objection if it ever has to arbitrate outside the council, and a further reason not to accept a buyer-nominated arbitrator without question.
Use the clause to your advantage where you can. If the buyer has itself invoked arbitration on a counterclaim, the existence of that proceeding shows a live dispute you can bring before the council instead, where Section 16 interest and the Section 19 pre-deposit apply. Before filing, read the dispute resolution clause in every purchase order in the chain, because buyers sometimes change the wording mid-relationship.